Project #06 (Templer’s Edge)
Apartment @ No. 10, Templer’s Place, Mount Lavinia.
Foundation Beam Concrete Completed (December 2024)
The Templer’s Edge has reached a major milestone — foundation beam concrete completed, paving the way for the next big steps!
The Templer’s Edge – Hestia Engineering (Pvt) Ltd
The Templer’s Edge – Hestia Engineering (Pvt) Ltd
The Templer’s Edge – Hestia Engineering (Pvt) Ltd
The Templer’s Edge – Hestia Engineering (Pvt) Ltd
The Templer’s Edge – Hestia Engineering (Pvt) Ltd
The Templer’s Edge – Hestia Engineering (Pvt) Ltd