PROJECT PROGRESS

The project was successfully completed – Project 05

You can dream, create, design, and build the most wonderful place in the world. But it requires people to make the dream a reality. Project #05 Mr. Samarajiva Home – @ Ratmalana. The project was successfully completed. (04th December 2021)  

Finishing work at Project 05

We listen to your needs, Design it to your Specifications, and Build it to your Dreams. Project #05 Mr. Samarajiva Home – @ Ratmalana. Finishing work

Water tank slab at Project 05

Project #05 Mr. Samarajiva Home – @ Ratmalana. Water tank slab  

1st Floor Electrical works at Project 05

Project #05 Mr. Samarajiva Home – @ Ratmalana. 1st Floor Electrical works are ongoing.  

1st Floor plastering work at Project 05

Project #05 Mr. Samarajiva Home – @ Ratmalana. 1st Floor plastering work  

1st Floor Masonry work at Project 05

Project #05 Mr. Samarajiva Home – @ Ratmalana. 1st Floor Masonry work.  

Roof top concrete at Project 05

Project #05 Mr. Samarajiva Home – @ Ratmalana. Rooftop concrete.  

Our newaly completed project at Ratmalana

Our newaly completed home project at Ratmalana. Happy client’s testimonials we will update soon on our Facebook. We are thanking the client for this opportunity, structural engineer, site engineer, project manager, staffs and labours.

Slab concrete work at Project 02

Slab concrete work at Project 02

Structural works at Project 02

Structural works at Project 02